![]() ![]() The new missile was 2cm thicker and the launchers of Dmitry Donskoi had to be remade, which cost RUB10b. The Navy CinC Kuroedov had personally ordered arming the subs with the new missile Bark, created by Miasskoe KB named after Makeeva. The lead unit of this class, the TK-208 Dmitry Donskoi, had been in overhaul since 1992 with the intent of receiving these modifications. The Typhoon submarines were initially intended to be retrofitted with a replacement of the D-19 launch system with an advanced system, and the new SS-N-28 Bark missile. A seventh vessel was begun but never finished. They formed part of the 1st flotilla of atomic submarines based in the Western Theater of the Northern fleet based at Nyerpichya. Between 19 six Typhoon submarines entered service. In total, six 941 submarines were built at Sevmash.Īfter intensive testing the heavy ballistic missile submarine 941-"TK-208" was commissioned in September 1980 and introduced into the Northern fleet on 12 December 1981. The first submarine of the project 941, which received the designation TK-208, was laid down at the shipyard of the shipbuilding enterprise in 1976 and launched on September 27, 1980. The developer was the Leningrad design bureau which is now the Central Design Bureau for Marine Engineering "Rubin".įor the construction of nuclear submarines at the Northern Machine-Building Enterprise, a new workshop was built specially - the largest covered boathouse in the world. The development of the 941 heavy strategic submarine was authorized in December 1972, and on 19 December 1973 the governmental officially issued the order to design and build the 941 ballistic missile submarine.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |